spray scrubber

英 [spreɪ ˈskrʌbə(r)] 美 [spreɪ ˈskrʌbər]

网络  喷雾洗涤器

化学



双语例句

  1. Experimental study on pressure drop characteristic of wet flue gas desulfurization spray scrubber with sieve tray was carried out by water and air.
    采用水-空气作为介质对湿法烟气脱硫筛板式喷淋塔阻力特性进行了实验研究。
  2. The performance of a lime spray dry scrubber is more sensitive to operating conditions.
    石灰喷雾干燥洗气器的性能对操作条件更为敏感。
  3. The influence of liquid distributed ring ( LDR) on flow field in spray scrubber of Nanjing Institute of Technology project has been analyzed by means of numerical simulation.
    通过对南京工程学院湿法烟气脱硫系统喷淋塔的数值模拟,分析了液体分布环(LDR)对塔内烟气流场的影响。
  4. The results show that the ratio of pore diameter to the diameter of scrubber must be ensured big enough for spray scrubber with sieve tray in WFGD system.
    结果表明,在WFGD系统筛板式喷淋塔中必须保证足够大的孔径与塔径比。
  5. The collision between the ships was caused by fog. The reagent slurry is injected through rotary atomizers or dual-fluid nozzles to create a finer droplet spray than wet scrubber systems.
    船只相撞事件因雾造成。试剂泥浆通过转台式雾化器或双重流体喷管进行喷射,形成比湿式净化器系统更优良的滴状喷雾。
  6. Wet Flue Gas Desulfurization ( WFGD) is a widely used process for flue gas desulfurization technique and a spray scrubber is a key device in WFGD system.
    喷淋塔是湿法脱硫系统的核心设备,它的优化设计时于提高脱硫效率至关重要。
  7. The ET-III-W can be used directly on the plating tank to remove rinse spray water and fume scrubber water.
    可直接用于对电镀槽,以消除冲洗洒水和烟气洗涤水。
  8. Study on Real-time Simulation Model of Spray Scrubber
    烟气脱硫喷淋塔实时仿真模型研究
  9. Numerical study on flow field of FGD spray scrubber
    湿法脱硫喷淋空塔流场数值分析
  10. Cold Flow Field Simulation for FGD Spray Scrubber with a Tray
    托盘式烟气脱硫喷淋塔空塔冷态流场数值模拟
  11. The heterogeneous oxidation kinetics of calcium sulphite in aqueous slurries of spray dry scrubber residues was studied in a pilot plant under typical conditions of wet flue gas desulphurization.
    在典型的湿法烟气脱硫条件下,喷雾干燥脱硫产物中的亚硫酸钙非均相氧化动力学在中试装置中被研究。
  12. An analytical calculation of non-isothermal absorption for a spray scrubber
    喷雾洗涤器非等温吸收的解析计算
  13. The deferent definitions of the volume-absorbing load are given, and the design steps of a spray scrubber body are described.
    讨论了容积吸收率不同角度的定义,给出了采用容积吸收率进行喷淋塔本体设计的步骤。
  14. According to the design and operation experiences, the volume of a spray scrubber can be decided by SO_2 concentration at the entrance and the needed absorbing efficiency when the volume absorbing load is chosen in a recommended range.
    在目前已有的设计、运行经验基础上,根据烟气的SO2进口浓度、要求的吸收效率等来确定喷淋塔容积。
  15. Based on the mechanism of wet flue gas desulphurization ( FGD), the real-time simulation model of the process in the spray scrubber is built.
    基于烟气湿法脱硫机理建立了喷淋塔内脱硫过程实时仿真模型。
  16. These results will help to optimize the design and operation of the spray drying scrubber.
    本文结果将有助于改进喷雾脱硫塔的设计和操作。
  17. The volume absorbing load and design of a spray scrubber for wet FGD
    烟气脱硫喷淋塔的容积负荷与本体设计
  18. Study on aerodynamic characteristics of FGD spray scrubber
    烟气脱硫喷淋塔流体力学特性研究
  19. Calculation of Height of Liquid Spray from Dynamic Wave Wet Scrubber and Resistance Loss
    动力波湿式洗涤器的液体喷射高度及阻力损失的计算
  20. Residence time of droplets in a spray scrubber for FGD
    烟气脱硫喷淋塔内液滴停留时间
  21. The total specific surface of packed tower is a lot larger than that of spray scrubber, and the filler layer is able to promote fluid turbulence, enhancing mass transfer between gas and liquid, so the desulfurization efficiency of packed tower is better than spray scrubber.
    填料塔的总比表面较空塔大很多,且填料层能够促进流体的湍动,加强气液间的传质,填料塔的脱硫效果明显优于空塔。